Saturday, August 28, 2010

Day Thirty two

 This week has flown by and now it is Saturday-----WOW!  Mom and I leave for "the house" around 9am
but stop at Wal -Mart on the way.  There are only a few jobs for us to do today.  Most of what is left has to be done by Glenn and Lansen.  There are a few areas that will need paint at a later date but they are not ready yet.  I decide to finish painting the medicine cabinet and the floor molding.  Elena prepares the bedroom floors so Mom can put a third coat of polyurethane on.  After seeing the living room we decided a third coat was necessary.  Glenn painted the second coat on the ceiling in the upstairs bathroom.  Lansen and Elena measure the living room for floor molding then work together to cut it.  Glenn makes a trip to a rental store to get a special roller for installing the vinyl and a nail gun to make putting up the molding easier.  After we all leave Glenn works on the pluming for the bathtub. 

Lansen and Andres will start moving in tomorrow.  I feel like the home improvement shows the day before the family returns home.  There a several unfinished projects and tools and construction debris ever where.  The living room, bedrooms and dining area are finished except window blinds.  Tomorrow should be interesting.

No comments:

Post a Comment