Saturday, August 21, 2010

Day Twenty four

Kyle joined Mom, John and me today.  Glenn had intentions of getting to "the house" around 9 am as it turned out it was 2:30 pm.  Better late than never though.   He made up for it by working until 9 pm, I think he likes working alone. 

Kyle taking out the sink drain
Small bedroom
By the end of the day a lot had been accomplished.  Mom and I worked on the bedroom floors.  I used Glenn's newest toy, an orbital  sander, between coats.  The small bedroom and the orange bedroom are finished other than reapplying the baseboards, cover plates on sockets, light switches and vents.  Joshua's bedroom needs sanded and a second coat of polyurethane.  We decided to wait on the hallway until the bathroom is finished.  When the floors were finished for the day we found other jobs.  Mom cleared all the stuff off the kitchen counters and I painted a second coat in the stairwell and wall.

John and Kyle worked on getting the living room ready for paint.  This required sanding the drywall patches, using wood putty on the window sills, and washing the walls.  Once Glenn arrived he put them on other jobs.  Kyle cleaned out the storm gutters and John cut boards for a new floor in the bathroom.  All three of them worked to take off the kitchen counters and the sink. 
It was nice to come home and have tacos prepared by Lansen and Elena.  Yummy!


No more kitchen counters
building bathroom floor

No comments:

Post a Comment